|
25-B1400
|
MATERIALS - APPROVED MATERIALS, USE*
|
View text
|
1/1/1900
|
|
25-B1401
|
DESIGN, CONSTRUCTION, AND INSTALLATION - APPRO VED SYSTEM AND CLEANABLE FIXTURES*
|
View text
|
1/1/1900
|
|
25-B1402
|
DESIGN, CONSTRUCTION, AND INSTALLATION - HANDWASHING SINKS, WATER TEMPERATURE, AND FLOW
|
View text
|
1/1/1900
|
|
25-B1403
|
DESIGN, CONSTRUCTION AND INSTALLATION - TOILETS AND URINALS
|
View text
|
1/1/1900
|
|
25-B1404
|
DESIGN, CONSTRUCTION AND INSTALLATION - SERVICE SINKS
|
View text
|
1/1/1900
|
|
25-B1405
|
DESIGN, CONSTRUCTION, AND INSTALLATION - BACKFLOW PREVENTION, AIR GAP*
|
View text
|
1/1/1900
|
|
25-B1406
|
DESIGN, CONSTRUCTION, AND INSTALLATION - BACKFLOW PREVENTION DEVICE, DESIGN STANDARD
|
View text
|
1/1/1900
|
|
25-B1407
|
DESIGN, CONSTRUCTION, AND INSTALLATION - CONDITIONING DEVICE, DESIGN
|
View text
|
1/1/1900
|
|
25-B1408
|
NUMBERS AND CAPACITIES - BACKFLOW PREVENTION DEVICE, WHEN REQUIRED*
|
View text
|
1/1/1900
|
|
25-B1409
|
NUMBERS AND CAPACITIES - BACKFLOW PREVENTION DEVICE, CARBONATOR*
|
View text
|
1/1/1900
|
|
25-B1410
|
LOCATION AND PLACEMENT BACKFLOW PREVENTION DEVICE
|
View text
|
1/1/1900
|
|
25-B1411
|
LOCATION AND PLACEMENT - CONDITIONING DEVICE
|
View text
|
1/1/1900
|
|
25-B1412
|
OPERATION AND MAINTENANCE - PROHIBITING A CROSS CONNECTION*
|
View text
|
1/1/1900
|
|
25-B1413
|
OPERATION AND MAINTENANCE - SCHEDULING INSPECTION AND SERVICE FOR A WATER SYSTEM DEVICE
|
View text
|
1/1/1900
|
|
25-B1414
|
OPERATION AND MAINTENANCE - WATER RESERVOIR OF FOGGING DEVICES, CLEANING*
|
View text
|
1/1/1900
|
|
25-B1415
|
OPERATION AND MAINTENANCE - SYSTEM MAINTAINED IN GOOD REPAIR*
|
View text
|
1/1/1900
|